Machinery Regulation from 20 January 2027: what manufacturers switch by the date
As of · sourced from primary law · not legal advice · Auf Deutsch lesen
Also in: DE · PL · IT · NL · ES · FR · PT · ZH · TR
This English version was prepared with AI from the German page. No native speaker or lawyer has read it. Found a mistake? Write to office@proofpass.eu.
The short answer
Yes: the Machinery Regulation, Regulation (EU) 2023/1230, applies from 20 January 2027, and Directive 2006/42/EC ends (Articles 51 and 54). The date counts per machine. What you place on the market from that day needs conformity route, documentation and declaration under the Regulation. Machines placed on the market earlier under the Directive may still be made available (Article 52).
Art. 51, 52 and 54 Regulation (EU) 2023/1230
The date counts per machine, not per series
Placing on the market means the first making available of a product on the Union market (Article 3). A series that runs across January therefore changes its law in the middle of production.
The Commission writes on this: before the date, machinery has to comply with the Directive. You may add in the declaration that it also complies with the Regulation, if that is true. Switching early does not replace the Directive.
| Machine is placed on the market | What applies | Provision |
|---|---|---|
| up to 19 January 2027 | Directive 2006/42/EC; making available remains allowed | Art. 52(1) |
| from 20 January 2027 | Regulation (EU) 2023/1230 | Art. 54 |
| Put into service for own use from 20 January 2027 | The Regulation; putting into service counts like placing on the market | Art. 3, Art. 10(1) |
Eight points belong on your switch list
Digital instructions are only one of them. The details are in the guide on digital instructions for use. The list names what you check per machine type.
| Topic | What applies from the date | Your task |
|---|---|---|
| Conformity route | Annex I, Part A: six categories, always with a notified body. Part B: module A only with standards that cover everything. Not in Annex I: module A (Art. 25) | Assign every type to a group |
| Declaration | Model structure in Annex V, Part A; standards with the date of their Official Journal reference. One declaration for all legal acts (Art. 21) | Set up the template anew |
| Technical documentation | Annex IV, Part A, including the risk assessment. Source code of safety-related software on a reasoned request | Check the file against the list (a) to (o) |
| Software and control system | Protection against corruption, evidence of interventions, tracing log enabled for five years after the upload (Annex III, 1.1.9 and 1.2.1) | Clarify with development |
| Marking | Model, series or type, year of construction, batch or serial number (Art. 10(5)). Name, postal address and website, e-mail address or other digital contact (para. 6) | Check the rating plate |
| Instructions for use | Digital format allowed, paper on request at the time of purchase (Art. 10(7)) | Fix the route and the address |
| Declaration with the product | Enclose it, or give the internet address or machine-readable code in the instructions; online for the expected lifetime and at least ten years (Art. 10(8)) | Decide and document |
| Supply chain | Be able to identify suppliers and customers for ten years (Art. 19) | Secure retention in the ERP system |
On harmonised standards the position is open
The list of standards under the Directive is running out. Implementing Decision (EU) 2026/2015 repeals Decision 2023/1586 with effect from 20 January 2027. The presumption of conformity under Article 20 of the Regulation requires that the reference of a standard has been published in the Official Journal.
On 3 November 2026 we found no decision in the EUR-Lex database that names standards under the Regulation. This mainly affects machinery in Annex I, Part B: module A there requires harmonised standards or common specifications that cover all the relevant requirements (Article 25(3)).
- Look in the Official Journal before every declaration, not in the old list.
- Talk to your notified body if you rely on module A for Part B.
- Describe other specifications in the documentation if a reference is missing (Annex IV, Part A, point (f)).
The new declaration has ten points
Annex V, Part A sets the content. Create the template once and reuse it for every type. Your test: if it still cites the Directive, it does not belong to a machine from the date onwards.
- The machinery: product, type, model, batch or serial number. Name and address of the manufacturer and, where applicable, the authorised representative.
- For lifting machinery that is permanently installed and can only be assembled at the place of use: the address of that place.
- The sentence on sole responsibility, the object of the declaration, the Union harmonisation legislation it conforms to.
- Harmonised standards or common specifications with the date of the reference, or other technical specifications with their date; for partial application, the parts applied.
- Notified body or the note on module A, additional information, place, date, name, function, signature.
Three questions for your development team
Sections 1.1.9 and 1.2.1 of Annex III are newly worded requirements for connected machinery and its control system. The Annex does not prescribe in detail how you meet them technically. So start with these questions. If one applies, the answer belongs in the risk assessment.
- Can a connected device or remote access lead to a hazardous situation?
- Does the machine show the safety software installed on it, and does it collect evidence of interventions in software and hardware?
- Is the tracing log of intervention data and of uploaded versions of safety software enabled for five years after the upload, for a reasoned request from the authority?
Backwards plan to the date
The interim dates are our suggestion, not legal deadlines. Only the last two are fixed.
- By 20 November 2026: list machine types, assign them to Annex I, assess use by non-professional users.
- By 4 December 2026: check software and control system against Annex III, report gaps to development.
- By 18 December 2026: declaration template, technical documentation, appointment with the notified body.
- By 15 January 2027: rating plate, accompanying sheet and online address finished, print released.
- 19 January 2027: last day for placing on the market under the Directive.
- 20 January 2027: the first machine under the Regulation leaves the building.
Example: a band saw across the date
The invented company Muster Holztechnik GmbH builds band saws with manual loading. They are listed in Annex I, Part B, point 4. Machine 412 goes to a distributor on 18 January 2027; it runs under the Directive. Machine 413 leaves on 21 January 2027. It needs the new declaration and the conformity route under Article 25(3).
From January the company therefore records, per serial number, the date of first making available and the version of the declaration. It can then answer an authority’s question with one line.
Germany and Austria directly, Switzerland with its own text
In Germany and Austria, as in every Member State, the Regulation applies directly (Article 54). Member States lay down the penalties themselves and had to notify them by 20 October 2026 (Article 50). We have not checked the national rules.
Switzerland is adapting its Machinery Ordinance. The Federal Council opened the consultation on 19 September 2025. We found no decision on entry into force or on updating the agreement with the EU. If your Swiss company supplies the EU, check the position with SECO.
What the Regulation does not regulate
It does not prescribe how you prove the date of placing on the market. It contains no duty to retrofit machines in the field. Only a substantial modification turns the person who carries it out into a manufacturer (Article 18). The product passport module covers the documents, not the conformity assessment.
Frequently asked questions
Will 20 January 2027 be postponed?
As of 3 November 2026 it does not look like it. Regulation (EU) 2026/1744 last amended the Regulation, but not Article 54 or the date. The consolidated text of 27 July 2026 names 20 January 2027.
Do I need new declarations for machines in stock?
Only if they have not yet been placed on the market. What was placed on the market under the Directive before the date may still be made available (Article 52(1)). Finished machines that you first supply after it fall under the Regulation.
Do my EC type-examination certificates stay valid?
Yes, until they expire (Article 52(2)). Ask your notified body what that means for machines from the date onwards. The Regulation does not answer this individual case further.
Does this also apply to partly completed machinery?
Yes, with its own documents: technical documentation under Annex IV, Part B, assembly instructions under Annex XI and the EU declaration of incorporation under Annex V, Part B (Article 11).
With ProofPass
ProofPass does not test a machine and does not issue a declaration of conformity. You store instructions and declaration per product, with all versions and a fixed address for the QR code. Paper requests come in through a form and are recorded with their date. The deadline check (in German) works without an account.
The terms and legal notices are in German, and the German version is binding.
Sources
- Regulation (EU) 2023/1230 (Machinery Regulation), consolidated text of 27 July 2026
- Implementing Decision (EU) 2026/2015 (standards under the Machinery Directive; repeals Decision 2023/1586 from 20 January 2027)
- European Commission: machinery
- Swiss Federal Council: consultation on the Machinery Ordinance, 19 September 2025 (German)
As of 3 November 2026. The legal text in force prevails. This page is not legal advice; sources are given above.